Direct Submission Process (DSP)

About

  • While the multi-gateway RABW will be the default regulatory process for most applications, simpler development typologies (e.g. single-unit residential development, standalone pavilion / linkway, racking system, etc.) need not be subjected to the typical RABW 3-Gateway Process, and can be approved through a more direct process.
  • Instead of multiple touchpoints at Design Gateway, Piling Gateway (optional) and Construction Gateway, the Direct Submission Process (DSP) is developed as a single-stage approval prior to TOP/CSC.
  • Industry can carry out pre-submission consultations with Agencies before proceeding with DSP with greater certainty.
  • Eligible projects will be put under DSP. Through the guided submission process, projects will also be put through lodgement / self-declaration / simplified submission scheme if eligible.

DSP