| Conservation | - Architectural features (e.g. windows, doors, plaster moulding, roof and floor finishes)
- New Structural works (e.g. strengthening)
- Interventions (e.g. new roof mezzanine, lift, openings)
- M&E installations (e.g. A/C units, flue)
Note: Extent of proposals to the above should be clearly indicated e.g. repair of existing, retention of existing, reinstatement of missing elements, 1-for-1 replacements or deletions. | Documents to be part of Approved Plan (Conservation) - Drawing or model of architectural details (e.g. decorative ornaments, doors, windows)
| Supplementary Documents - Structural report, method statement, protective measure, PE’s endorsement (for new structural works)
- Structural drawing (for new structural works)
- Design Advisory Panel (Conservation) (DAPC) presentation material, if required
- (For non-BIM submission) Measured survey drawing (for unrestored building) (if not already submitted in full in Design Gateway (G1))
- (For BIM submissions) BIM model of existing building for unrestored building or BIM model of approved plan for restored building (if not already submitted in full in Design Gateway (G1))
- Heritage interpretation plan, if required
|
|